THE FLOOR INSPECTION PROCESS Cambodia,China,Vietnam,India,Malaysia

THE FLOOR INSPECTION PROCESS

  1. Initial phone interview with the client
  2. Concerns are discussed such as testing activities, fees and contractual agreements
  3. An appointment is set to meet and conduct the inspection
  4.  An independent inspection normally consists of a two hour on-site examination of the flooring concerns and problems. Most of the job site testing, measuring, examination and evaluation will happen at this time
  5.  Flooring Inspection Report is completed
  6. The final stage is to engage in a thorough review of the preliminary report
  7. Finished documents and job site photos are delivered to the client

About admin

Check Also

Quality Inspection Report: UV Prefinished Birch Plywood QIR-MY-08282025 August 28, 2025 WHITE BIRCH PLYWOOD Manufacturing Facility, Malaysia UV Prefinished Birch Plywood Inspected On Behalf Of: A designated U.S.-based Importer

Quality Inspection Report: UV Prefinished Birch Plywood Report Number: QIR-MY-08282025Date of Inspection: August 28, 2025Inspection …

Leave a Reply

Your email address will not be published. Required fields are marked *